在研项目  
近期成果  
科研动态  
学术前沿  
您的位置: 首页 >> 科学研究 >> 学术前沿
《Journal of Construction Engineering and Management》杂志刊登“中国水电项目发展过程中业主的能力和项目绩效之间的关系”
发布时间: 2013-04-08   来源:

《Journal of Construction Engineering and Management》杂志刊登“中国水电项目发展过程中业主的能力和项目绩效之间的关系”

作  者:Shuli Wang; Wenzhe Tang; Yuxuan Li

刊  物:《Journal of Construction Engineering and Management》, 2013年2月印刷

摘  要:现有的研究很认同业主的能力和项目绩效之间存在关联。然而,有限的研究已经表明系统地处理了多层面的组织能力和项目执行情况之间的相关关系。本文通过开发并测试了一种能力模型来定量的研究它们之间的关系。同时在中国水电行业收集的数据的支持下,这项研究揭示业主的能力和项目绩效之间具有很强的相关性,证明通过业主的能力来获得的稀缺宝贵的资源、跨组织联系、信息管理、整合和管理资源,并对水电项目的绩效具有显著的影响。因此,可得出以下结论:业主的能力不仅仅有利于最大化利用各参与者的资源来改善工程质量、缩短工期、减少成本、提高安全性,而且在妥善处理境外水电项目和生态环境影响方面也发挥了重大作用。未来的研究应集中于了解业主如何准确地通过外部环境来获得资源,如何成功地通过整合和管理组织内部和组织之间层面上相互依存的项目交付过程来获得良好的项目绩效。

Relationships between Owners' Capabilities and Performance on Development of Hydropower Projects in China

Authors: Shuli Wang; Wenzhe Tang; Yuxuan Li

Journal: Journal of Construction Engineering and Management, Published: 07 February 2013.  

Abstract: Existing studies tend to agree that there are links between owners' capabilities and project performance. However, limited research has systematically addressed the relationships among the muti-facets of organizational capabilities and project performance. This paper quantitatively investigated the relationships among them by developing and testing a capability model. With support of data collected from the hydropower project industry in China,this study has revealed strong correlations between owners' capabilities and project performances, confirming owners' capabilities on obtaining scarce and valued resources, inter-organizational linking, information management, and integrating and managing resources can have significant impacts on hydropower project performances. It is concluded that the above owners' capabilities are not only important to improve project performances on quality, time, cost and safety by maximizing the effectiveness of each participant's resources, but also critical to appropriately deal with hydropower projects' externalities for achieving the objectives on project migration, and ecological and environmental impacts. Future studies should be conducted to understand how owners to correctly perceive the properties of external environment for obtaining resources, and to successfully integrate and manage reciprocally interdependent project delivery processes at both antra- and inter-organizational levels to achieve superior project performance.

原文链接:http://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000694

翻译:翟洁;审核:安鹏
 
版权所有:流域水循环模拟与调控国家重点实验室 技术支持:中国水科院信息中心
电话:010-68781697,68781380 邮箱:skl-cjb@iwhr.com 地址:海淀区复兴路甲一号D座936室
Produced By CMS 网站群内容管理系统 publishdate:2023/05/30 13:32:41